Tuckertown Water Treatment Plant

Print
Press Enter to show all options, press Tab go to next option

Tuckertown Water Treatment Plant

This facility is located near the bridge on Highway 49, which crosses the Tuckertown Reservoir.

Construction on this facility was completed in 1992.  This facility can produce up to 6.5 million gallons per day of potable water. 

There is a raw water reservoir located at the facility, which can store approximately 35 million gallons for treatment.  A pump station located at the site pumps the raw water from the Tuckertown Reservoir.

A potable water ground storage tank with a 4 million gallon capacity is located on site.  Due to the elevation of this site all the water produced by Tuckertown flows to Albemarle by gravity and is not pumped.

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Download Acrobat Reader Flash Player Download Flash Player Windows Media Player Download Windows Media Player Microsoft Silverlight Download Microsoft Silverlight Word Viewer Download Word Viewer Excel Viewer Download Excel Viewer PowerPoint Viewer Download PowerPoint Viewer